I have a 3 layer.
Vapour control layer cold flat roof.
Vapour control layers are positioned to the inside of the insulation in order to minimise the amount of warm moist air entering the.
Including fibreglass roof kits torch on felt and liquid rubber products everything you need for flat roofing is in one place.
An effective vapour control layer at ceiling level an unobstructed 50mm ventilation space above the insulation.
Be it a cold or warm roof construction the primary function of a vcl is to keep warm moist air from inside the building inside the building.
Don t get caught out by ignoring the vapour control layer.
Vapour control layer for a cold roof.
Vapour control layers vcl.
At roofing superstore our choice of flat roof materials includes everything you need to create a long lasting weather proof flat roof that performs and looks good too.
A vapour control layer or vcl on a warm flat roof sits between the roof decking and the insulation.
The flat roof has 2 roof lanterns.
Hi i m in the process of building a single story flat roof extension.
Vcls prevent excess moisture entering a wall s cavity behind the insulation.
Bs6229 2003 gives advice on vapour control layers in flat roofs and the control of condensation within the building generally.
The type of 3 layer roof.
I have been looking through insurance and they seem to ask about type of flat roofs.
It s the first line of defence against high vapour pressure air entering the roof structure and causing interstitial condensation.
A question for the experts.
Cold bridging through the system is easier to eliminate or control as ordinarily there are no breaches from the structural supports as there is in a cold roof construction.
Warm roof build ups can be installed on most modern construction material types such as concrete timber and timber based sheets.
A vapour control layer or vcl for short is a plastic layer that restricts the movement of warm moist air from inside a property into the fabric of the building.
However the cross ventilation does not completely remove the moisture vapour in the ceiling void and a vapour control layer sealed at joints and penetrations is required under the insulation and over the plasterboard to provide a barrier against moisture vapour rising up from the room below.
The notion behind a vapour control layer is to install it on the room.